Dhaka 29 November, 2026

Third Terminal Passengers to Receive Baggage Within 15 Minutes

RTV News

Publish : 29 Nov 2026, 05:39 PM
Photo: Collected

Passengers arriving at the Third Terminal of Hazrat Shahjalal International Airport (HSIA) will receive their baggage within just 15 minutes, Civil Aviation Authority of Bangladesh (CAAB) Chairman Air Vice Marshal Md. Mostafa Mahmud Siddique announced on Sunday.

Speaking at a press conference at the CAAB headquarters auditorium ahead of the Third Terminal concession agreement signing, he confirmed that strict service-level timelines are embedded into the upcoming contract with a Japanese consortium.

Strict Timelines and Penalties for Service Delays
To eliminate prolonged waiting times for arriving passengers, the agreement establishes strict operational benchmarks:

First Bag Delivery: Must reach the conveyor belt within 15 minutes of aircraft chock-on (stopping).

Last Bag Delivery: Capped at 42.5 minutes for narrow-body aircraft and 47.5 minutes for wide-body aircraft.

Check-in Queues: Average waiting times at check-in counters are capped at 5 to 10 minutes for business class passengers and 20 to 30 minutes for economy class passengers.

To ensure accountability, the contract enforces liquidated damages for repeated failures to meet key performance indicators (KPIs). Depending on the nature and frequency of the lapse, the operating consortium will face predetermined financial penalties ranging from $5,000 to $35,000 per violation.

Concession Agreement and Rollout Schedule
Following extensive technical and financial reviews, CAAB is scheduled to sign the 15-year concession agreement with the Japanese consortium tomorrow (Monday, November 30).

Handover: The concession area will be handed over to the operator within 15 days of signing.

Soft Launch: Partial operations are slated to begin on December 16 (Victory Day) with the handling of four flights.

Full Transition: At least 25 percent of regular international flights will shift within eight months of handover, with 100 percent of scheduled international passenger and cargo operations transferring within 14 months. The 15-year concession period takes effect once all regular international flights relocate to the new terminal.

Once the Third Terminal reaches full capacity, CAAB will utilize the existing Terminal-1 and Terminal-2 for domestic flights, Hajj flights, and other non-scheduled operations.

Revenue Sharing and Operational Control
Under the revenue-sharing framework, the operating consortium will pay CAAB 13.5 percent of gross passenger and cargo revenue on a monthly basis from the start of operations. Once the terminal reaches full capacity—either on the scheduled date or the actual date of full operation, whichever comes first—CAAB’s revenue share will double to 27 percent.

The Japanese consortium will operate, repair, and maintain the Third Terminal, the multi-level car park, and the new import-export cargo terminals at its own expense. In return, the operator will collect embarkation fees, passenger boarding bridge fees, and non-aeronautical revenues from retail shops, lounges, parking, and advertising.

For ground handling, an international operator will be appointed alongside Biman Bangladesh Airlines, with both—along with self-handling airlines—paying royalties to the terminal operator. Biman will also pay a per-ton royalty in US dollars to the operator for cargo handling services.

Crucially, core sovereign and airside security functions will remain under state control:

CAAB: Runway, taxiway, apron, air traffic control (ATC), aviation security, security screening, and firefighting and rescue operations.

Government Agencies: Immigration, customs, health screening, and other state functions.

Terminal Infrastructure at a Glance
Designed to boost aviation capacity, international connectivity, tourism, and trade, the 230,000-square-meter facility can serve 24 million passengers annually.

Facility / Equipment Capacity & Specifications
Check-in & Immigration 127 check-in counters (including self-check-in), 129 passport control counters (114 manual, 15 automated), 8 on-arrival visa counters, 10 transit/transfer counters, 16 airline ticket counters
Baggage & Aircraft Bays 16 spacious baggage conveyor belts, 12 contact boarding bridges, 25 remote aircraft parking bays
Security Systems 99 baggage X-ray machines, 22 body scanners, 55 walk-through metal detectors, 39 explosive detection systems
Cargo Terminals 27,000 sq m import terminal (273,470 MT/year) and 36,000 sq m export terminal (546,941 MT/year) — 820,411 MT total annual capacity
Passenger Mobility & Parking Moving walkways, escalators, elevators, and a multi-level parking facility for 1,230 vehicles

Follow google news channel to get RTV news Google News
Former SB Chief Monirul's Wife, Two Brothers-in-Law Detained
The Detective Branch (DB) of Dhaka Metropolitan Police has detained the wife and two brothers-in-law of former Special Branch (SB) chief Monirul Islam on charges of plotting violence and sabotage in the capital, Dhaka.
Former SB Chief Monirul's Wife, Two Brothers-in-Law Detained
Essential to Inspire New Generation Toward Agriculture: Dr. Zubaida
Dr. Zubaida Rahman, President of the Ziaur Rahman Foundation, has emphasized the urgent need to inspire the younger generation toward agriculture.
Essential to Inspire New Generation Toward Agriculture: Dr. Zubaida
Police Arrest Top Terror 'Sweden Aslam' While Attempting to Flee Country
Police have arrested Sweden Aslam, one of the capital's most notorious top terrors, while he was attempting to flee the country.
Police Arrest Top Terror 'Sweden Aslam' While Attempting to Flee Country
Former Air Force Officer's Body Recovered From Turag River
The River Police have recovered the body of KM Tahsin Sauri (28), a former Air Force officer, from the Turag River in Dhaka, one day after he went missing.
Former Air Force Officer's Body Recovered From Turag River
Fire Under Control in Chawkbazar After 12 Hours
Ten firefighting units have brought a massive fire under control at Mansur Khan Plaza in the capital's old Dhaka area of Chawkbazar, following a grueling 12-hour operation.
Fire Under Control in Chawkbazar After 12 Hours
Read More
Menzies Targets USD 12m Investment and 5500 Total Jobs for Dhaka Airport Third Terminal Operation
UK Expresses Interest in Ground Handling for Hazrat Shahjalal’s Third Terminal